Road work: miscellaneous construction listed on SD-20 from Oct. 8, 2026
The South Dakota Department of Transportation lists Road work: miscellaneous construction at SD-20 10.75 miles east of Junction US 85 North-Buffalo, with a listed start of Oct. 8, 2026.
605Buzz Added Record date Last ledger entry
Published automatically from public-record data — not yet reviewed by an editor.
SD-20 near Buffalo is scheduled for miscellaneous construction in both directions.
The state transportation department describes the work this way:
The following road construction project is in progress: miscellaneous construction adjacent to the roadway Monday through Friday between 6:00 AM and 5:00 PM until 7:37 AM MST Friday, November 13, 2026. Drivers should use caution and be prepared for construction equipment and workers near the roadway.
For information or questions about a construction project, please find contact information for our SDDOT Area Offices at:
The listed work zone is at SD-20 10.75 miles east of the US 85 North junction at Buffalo, near milepost 15. The work is listed from 8:37 a.m. MDT (9:37 a.m. CDT) Thursday, Oct. 8, 2026, until 7:37 a.m. MST (8:37 a.m. CST) Friday, Nov. 13. The listing does not say which time zone applies, so both are given.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.
Around this record
The records published so far include 1 road record from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. SDDOT published no end date for that record, which is how the department represents work scheduled until further notice — whether those are current cannot be worked out from the records, and no guess is made. SD511 is the department's own live conditions service.
This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.
Email me when this record changes
These records are re-read on a schedule. Pick something this record
states, and you'll hear when it is corrected or the filing behind it
is amended — and when any other published record states that same
value under that same field, whichever body published it.
Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number
or an employer — never a person's name or a street address.
What following means
·
Privacy notice