Road work: paving, uneven lanes listed on SD-20 from Sept. 2, 2026
The South Dakota Department of Transportation lists Road work: paving, uneven lanes at SD-20 from 10 miles west of Junction South Dakota 37 North-Conde to Junction South Dakota 37 North-Conde, with a listed start of Sept. 2, 2026.
605Buzz Added Record date Last ledger entry
Published automatically from public-record data — not yet reviewed by an editor.
SD-20 near Conde is scheduled for paving and uneven lanes in both directions.
Work includes paving and uneven lanes with delays 15 minutes, flaggers, and pilot car until further notice. The project consists of milling, asphalt paving, and Pipe work. The driving surface will be milled. Traffic will be controlled with flaggers and pilot car.
The listed work zone runs from 10 miles west of the South Dakota 37 North junction at Conde to the South Dakota 37 North junction at Conde, near milepost 334. The work is listed from 10:52 a.m. MDT (11:52 a.m. CDT) Wednesday, Sept. 2, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.
Email me when this record changes
These records are re-read on a schedule. Pick something this record
states, and you'll hear when it is corrected or the filing behind it
is amended — and when any other published record states that same
value under that same field, whichever body published it.
Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number
or an employer — never a person's name or a street address.
What following means
·
Privacy notice