Corrections record
Public safety / First published
Road work: miscellaneous construction, striping listed on SD-28 from Nov. 12, 2026
Published automatically from public-record data. Whether a person reviewed any later version is recorded against that version below. This heading is the article's current headline.
Article identifier: sd511-road-work-12906820
Version history
Every published version of this article, newest first. Versions are append-only: a correction adds a row, it never rewrites history. Each version below states what changed against the version before it — which fields moved, and which body lines were added or removed.
The content hash is a SHA-256 fingerprint of that version's stored headline and body, computed when the version was written. Two versions with the same hash hold identical text; a changed hash proves the text moved. It is the tamper-evidence check — recompute it against an exported copy of a version and any silent edit shows up as a mismatch.
How we verify a hash — and how you can
Canonicalization: the hashed bytes are the version's stored headline, then the two characters ||, then the version's stored body markdown — UTF-8, SHA-256, lowercase hex. Nothing else is in the input: no normalization, re-wrapping or rendering is applied first, no trailing newline is added, and no other field (including the parent version's id) is mixed in.
Export a version's stored headline and body, join them with the two characters ||, and take the SHA-256 of the UTF-8 bytes. It must equal the hash printed beside that version. In a shell:
printf '%s' "HEADLINE||BODY" | shasum -a 256 -
Version 6
Source update — the underlying public record changed
Update from the source feed — no human edit
The headline and the body text both changed. (compared against version 5)
Headline at this version: Road work: miscellaneous construction, striping listed on SD-28 from Nov. 12, 2026
Dek at this version: The South Dakota Department of Transportation lists Road work: miscellaneous construction, striping at SD-28 from 0.25 mile west to 0.25 mile east of Toronto, with a listed start of Nov. 12, 2026.
Removed (2 lines )
- Work includes miscellaneous construction adjacent to the roadway and striping with no passing and speed limit 25 mph until further notice. This project is currently in Phase 2 and remaining work is primarily off the roadway. Asphalt Paving on mainline SD 28 has been completed and traffic is running on the new pavement. Remaining work includes sidewalk, approach pavement, lighting, striping, seeding, and cleanup.
- The listed work zone runs from a quarter mile west to a quarter mile east of Toronto, near milepost 97. The work is listed from 1:37 p.m. MST (2:37 p.m. CST) Tuesday, Nov. 3, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
Added (2 lines)
- Work includes miscellaneous construction adjacent to the roadway and striping with no passing and speed limit 25 mph until further notice. This project is currently in Phase 2 and remaining work is primarily off the roadway. Asphalt Paving on mainline SD 28 has been completed and traffic is running on the new pavement. Remaining work includes sidewalk, approach pavement, permanent signs, parking area striping, seeding, and cleanup.
- The listed work zone runs from a quarter mile west to a quarter mile east of Toronto, near milepost 97. The work is listed from 2:11 p.m. MST (3:11 p.m. CST) Thursday, Nov. 12, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
Content hash:
f790ffe319985fd557dae73d92f7f64454dc4480787ec44f893a6924cbb0a10b -
Version 5
Wording carried forward. 605Buzz changed its own wording of this page after the previous entry and before the next one. This entry records the page as it read just before the source’s change, so the next entry shows only the source’s change. It does not say whether the earlier wording was right or wrong.
Revised by 605Buzz — recorded under an internal label that names no person who read this version
The body text changed; the headline did not. (compared against version 4)
Dek at this version: The South Dakota Department of Transportation lists Road work: miscellaneous construction, striping at SD-28 from 0.25 mile west to 0.25 mile east of Toronto, with a listed start of Nov. 3, 2026.
Removed (15 lines )
- **Road work: miscellaneous construction, striping** is listed at SD-28 from 0.25 mile west to 0.25 mile east of Toronto, according to the South Dakota Department of Transportation's traveller-information feed.
- The feed gives the route as SD-28, the reference milepost as 97.490 and the affected direction as Both Directions.
- The feed publishes a listed start of Nov. 3, 2026, 1:37 p.m. MST / 2:37 p.m. CST and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
- Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
- The feed publishes coordinates of 44.57279761, -96.64257378 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
- The department's own description of the work, reproduced without changes as published in the feed:
- > The following road construction project is in progress: miscellaneous construction adjacent to the roadway and striping with no passing and speed limit 25 mph until further notice. This project is currently in Phase 2 and remaining work is primarily off the roadway. Asphalt Paving on mainline SD 28 has been completed and traffic is running on the new pavement. Remaining work includes sidewalk, approach pavement, lighting, striping, seeding, and cleanup.
- That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
- The feed links [dot.sd.gov/toronto28](https://dot.sd.gov/toronto28) for this project.
- 605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check [SD511](https://www.sd511.org/) before travelling.
Added (5 lines)
- SD-28 near Toronto is scheduled for miscellaneous construction and striping in both directions.
- Work includes miscellaneous construction adjacent to the roadway and striping with no passing and speed limit 25 mph until further notice. This project is currently in Phase 2 and remaining work is primarily off the roadway. Asphalt Paving on mainline SD 28 has been completed and traffic is running on the new pavement. Remaining work includes sidewalk, approach pavement, lighting, striping, seeding, and cleanup.
- The listed work zone runs from a quarter mile west to a quarter mile east of Toronto, near milepost 97. The work is listed from 1:37 p.m. MST (2:37 p.m. CST) Tuesday, Nov. 3, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
- The project has its own page: [dot.sd.gov/toronto28](https://dot.sd.gov/toronto28).
- Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at [SD511](https://www.sd511.org/).
Content hash:
59803768b24bfe05184f23435084189de1bdc523157682ecab729149cb97fbe0 -
Version 4
Source update — the underlying public record changed
Update from the source feed — no human edit
The headline and the body text both changed. (compared against version 3)
Headline at this version: Road work: miscellaneous construction, striping listed on SD-28 from Nov. 3, 2026
Removed (3 lines )
- **Road work: gravel surface, miscellaneous construction, paving** is listed at SD-28 from 0.25 mile west to 0.25 mile east of Toronto, according to the South Dakota Department of Transportation's traveller-information feed.
- The feed publishes a listed start of Oct. 26, 2026, 5:59 a.m. MDT / 6:59 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
- > The following road construction project is in progress: gravel surface, miscellaneous construction adjacent to the roadway, and paving with delays 10 minutes, flaggers, lanes reduced to 1, no passing, pilot car, and speed limit 25 mph until further notice. This project is currently in Phase 2 and remaining work is primarily off the roadway. Asphalt Paving on mainline SD 28 has been completed and traffic is running on the new pavement. Remaining work includes side street / parking lot pavement, sidewalk, approach pavement, lighting, striping, seeding, and cleanup.
Added (3 lines)
- **Road work: miscellaneous construction, striping** is listed at SD-28 from 0.25 mile west to 0.25 mile east of Toronto, according to the South Dakota Department of Transportation's traveller-information feed.
- The feed publishes a listed start of Nov. 3, 2026, 1:37 p.m. MST / 2:37 p.m. CST and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
- > The following road construction project is in progress: miscellaneous construction adjacent to the roadway and striping with no passing and speed limit 25 mph until further notice. This project is currently in Phase 2 and remaining work is primarily off the roadway. Asphalt Paving on mainline SD 28 has been completed and traffic is running on the new pavement. Remaining work includes sidewalk, approach pavement, lighting, striping, seeding, and cleanup.
Content hash:
c41ffdc29273eb1688406481a8ca6f7bf417153a110c7ef5d0bb7b7804f8d2ba -
Version 3
Source update — the underlying public record changed
Update from the source feed — no human edit
The headline and the body text both changed. (compared against version 2)
Headline at this version: Road work: gravel surface, miscellaneous construction, paving listed on SD-28 from Oct. 26, 2026
Removed (2 lines )
- The feed publishes a listed start of Oct. 19, 2026, 6:46 a.m. MDT / 7:46 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
- > The following road construction project is in progress: gravel surface, miscellaneous construction adjacent to the roadway, and paving with delays 10 minutes, flaggers, lanes reduced to 1, no passing, pilot car, speed limit 25 mph, traffic routed to opposing lanes, and width limit 10 ft until further notice. Urban Reconstruction thru Toronto with 10' Width Restriction. Local traffic will be maintained as two way traffic thru town on gravel roadway. This project is currently in Phase 2 with two way traffic running on the temporary gravel surfacing placed in Phase 1. Asphalt Paving of both Phase 1 and Phase 2 will occur this fall.
Added (2 lines)
- The feed publishes a listed start of Oct. 26, 2026, 5:59 a.m. MDT / 6:59 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
- > The following road construction project is in progress: gravel surface, miscellaneous construction adjacent to the roadway, and paving with delays 10 minutes, flaggers, lanes reduced to 1, no passing, pilot car, and speed limit 25 mph until further notice. This project is currently in Phase 2 and remaining work is primarily off the roadway. Asphalt Paving on mainline SD 28 has been completed and traffic is running on the new pavement. Remaining work includes side street / parking lot pavement, sidewalk, approach pavement, lighting, striping, seeding, and cleanup.
Content hash:
345daf38be6e27392a18a067f5e898d33e8b194ce6399f0627c4dd4e97ce8bb3 -
Version 2
Source update — the underlying public record changed
This entry was filed before 605Buzz began recording its own wording changes separately. Its diff may also show wording changes 605Buzz made since the previous entry.
Update from the source feed — no human edit
The headline and the body text both changed. (compared against version 1)
Headline at this version: Road work: gravel surface, miscellaneous construction, paving listed on SD-28 from Oct. 19, 2026
Removed (3 lines )
- **Road work: grading, miscellaneous construction, utilities work** is listed at SD-28 from 0.25 mile west to 0.25 mile east of Toronto, according to the South Dakota Department of Transportation's traveller-information feed.
- The feed publishes a listed start of Aug. 25, 2026, 7:21 a.m. MDT / 8:21 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
- > The following road construction project is in progress: grading, miscellaneous construction adjacent to the roadway, and utilities work with delays 10 minutes, flaggers, lanes reduced to 1, no passing, speed limit 25 mph, traffic routed to opposing lanes, and width limit 10 ft until further notice. Urban Reconstruction thru Toronto with 10' Width Restriction. Local traffic will be maintained as two way traffic thru town. This project is currently in Phase 2 with two way traffic running on the temporary surfacing placed in Phase 1. Asphalt Paving of both Phase 1 and Phase 2 will occur this fall.
Added (3 lines)
- **Road work: gravel surface, miscellaneous construction, paving** is listed at SD-28 from 0.25 mile west to 0.25 mile east of Toronto, according to the South Dakota Department of Transportation's traveller-information feed.
- The feed publishes a listed start of Oct. 19, 2026, 6:46 a.m. MDT / 7:46 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
- > The following road construction project is in progress: gravel surface, miscellaneous construction adjacent to the roadway, and paving with delays 10 minutes, flaggers, lanes reduced to 1, no passing, pilot car, speed limit 25 mph, traffic routed to opposing lanes, and width limit 10 ft until further notice. Urban Reconstruction thru Toronto with 10' Width Restriction. Local traffic will be maintained as two way traffic thru town on gravel roadway. This project is currently in Phase 2 with two way traffic running on the temporary gravel surfacing placed in Phase 1. Asphalt Paving of both Phase 1 and Phase 2 will occur this fall.
Content hash:
a28a4034da1c9ffb1a3626099da5941d54a268ba97460b16ea8dd4c97f0800f3 -
Version 1
Initial publication
Initial publication — no human byline
No earlier version is in this record, so there is nothing to compare against.
Content hash:
a64dc903ff6db8c0ce893b5f9f983a927a47c3c597cdc763bd45e20f21a6bd95
4 corrections have been issued.
See something wrong? Read the corrections policy or write to [email protected] — though mail to 605buzz.com is not routed yet, so that address currently bounces.