Road work: pavement repair listed on I-29 from Oct. 16, 2026
The South Dakota Department of Transportation lists Road work: pavement repair at I-29 from 0.50 mile south of Junction US 18 East-Exit 62 to 5 miles south of Junction Interstate 229-Sioux Falls-Exit 75, with a listed start of Oct. 16, 2026.
605Buzz Added Record date
Published automatically from public-record data — not yet reviewed by an editor.
I-29 near East is scheduled for pavement repair in both directions.
Work includes pavement repair with lanes reduced to 1 and speed limit 65 mph until further notice. Concrete and Asphalt Shoulder Repairs. Lane closures with reduced speeds and workers present.
The listed work zone runs from half a mile south of the US 18 East junction (Exit 62) to 5 miles south of the Interstate 229 junction at Sioux Falls (Exit 75), near milepost 66. The work is listed from 9:06 a.m. MDT (10:06 a.m. CDT) Friday, Oct. 16, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.
Around this record
The records published so far include 14 road records from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. SDDOT published no end date for all of them, which is how the department represents work scheduled until further notice — whether those are current cannot be worked out from the records, and no guess is made. SD511 is the department's own live conditions service.
Restrictions: paving listed on SD-44 from June 22, 2026
— 3.7 miles from the
coordinate its source published, in a straight line
, SD-44 from 0.50 mile east of Junction South Dakota 17-Lennox to Junction Interstate 29 near Worthing
This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.
Email me when this record changes
These records are re-read on a schedule. Pick something this record
states, and you'll hear when it is corrected or the filing behind it
is amended — and when any other published record states that same
value under that same field, whichever body published it.
Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number
or an employer — never a person's name or a street address.
What following means
·
Privacy notice