Road work: miscellaneous construction listed on US-14 from Oct. 5, 2026
The South Dakota Department of Transportation lists Road work: miscellaneous construction at US-14 from Junction South Dakota 34-Four Corners to 8.50 miles east of Hayes, with a listed start of Oct. 5, 2026.
605Buzz Added Record date
Published automatically from public-record data — not yet reviewed by an editor.
US-14 near Four Corners is scheduled for miscellaneous construction in both directions.
Work includes miscellaneous construction with flaggers and pilot car until further notice. Crews will be grinding centerline rumble stripes followed by pavement markings. Traffic will be controlled by Flaggers and Pilot Car while crews are working. Expect 15 minute delays, Fresh Oil, and Fresh Paint. Work is scheduled to be completed by October 23rd.
The listed work zone runs from the South Dakota 34 junction at Four Corners to 8.50 miles east of Hayes, near milepost 84. The work is listed from 7:49 a.m. MDT (8:49 a.m. CDT) Monday, Oct. 5, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.
Around this record
The records published so far include 3 road records from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. SDDOT published no end date for all of them, which is how the department represents work scheduled until further notice — whether those are current cannot be worked out from the records, and no guess is made. SD511 is the department's own live conditions service.
This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.
Email me when this record changes
These records are re-read on a schedule. Pick something this record
states, and you'll hear when it is corrected or the filing behind it
is amended — and when any other published record states that same
value under that same field, whichever body published it.
Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number
or an employer — never a person's name or a street address.
What following means
·
Privacy notice