Road work: maintenance listed on US-212 from Sept. 10, 2026
The South Dakota Department of Transportation lists Road work: maintenance at US-212 from Missouri River Bridge to 0.75 mile west of Junction South Dakota 1804 South, with a listed start of Sept. 10, 2026.
605Buzz Added Record date
Published automatically from public-record data — not yet reviewed by an editor.
US-212 is scheduled for maintenance in both directions.
Work includes maintenance on bridges with flaggers, lanes reduced to 1, and width limit 15 ft until further notice.
The listed work zone runs from Missouri River Bridge to three-quarters of a mile west of the South Dakota 1804 South junction, near milepost 207. The work is listed from 6:18 a.m. MDT (7:18 a.m. CDT) Thursday, Sept. 10, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.
Around this record
The records published so far include 1 road record from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. SDDOT published no end date for that record, which is how the department represents work scheduled until further notice — whether those are current cannot be worked out from the records, and no guess is made. SD511 is the department's own live conditions service.
This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.
Email me when this record changes
These records are re-read on a schedule. Pick something this record
states, and you'll hear when it is corrected or the filing behind it
is amended — and when any other published record states that same
value under that same field, whichever body published it.
Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number
or an employer — never a person's name or a street address.
What following means
·
Privacy notice