public-safety
Road work: bridge construction, grading, paving listed on I-90 from Aug. 17, 2026
The South Dakota Department of Transportation lists Road work: bridge construction, grading, paving at I-90 from 2.50 miles west of Piedmont-Exit 46 to 0.25 mile west of Summerset-Exit 48, with a listed start of Aug. 17, 2026.
Published automatically from public-record data — not yet reviewed by an editor.
Key facts
- What
- Public safety
- When
- Record date Aug. 17, 2026; Added Aug. 19, 2026
- Source
- Road work and restrictions
- Read time
- About 1 minute
How this desk works (below the article)
I-90 near Piedmont is scheduled for bridge construction, grading and paving in both directions.
Work includes bridge construction adjacent to the roadway, grading adjacent to the roadway, and paving adjacent to the roadway with lanes reduced to 1, no passing, and width limit 16 ft until 4 p.m. MST Wednesday, Nov. 25, 2026. A project to reconstruct Exit 46 is currently underway. Work includes grading, paving, and bridge work adjacent to the roadway and in the median of Interstate 90. Traffic is limited to a single lane in each direction with Speed Limits reduced to 65 MPH. When workers are present, the speed limit may be reduced to 45 MPH.
The listed work zone runs from 2.50 miles west of the Piedmont exit (Exit 46) to a quarter mile west of the Summerset exit (Exit 48), near milepost 46. The work is listed from 7:50 a.m. MDT (8:50 a.m. CDT) Monday, Aug. 17 until 4 p.m. MST (5 p.m. CST) Wednesday, Nov. 25. The listing does not say which time zone applies, so both are given.
The project has its own page: dot.sd.gov/i90exit46.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.