Road work: bridge repair listed on US-281 from April 21, 2026
The South Dakota Department of Transportation lists Road work: bridge repair at US-281 from 9.50 miles south to 6 miles south of Junction US 12-Aberdeen, with a listed start of April 21, 2026.
605Buzz Added Record date Last ledger entry
Published automatically from public-record data — not yet reviewed by an editor.
US-281 near Aberdeen is scheduled for bridge repair in both directions.
The state transportation department describes the work this way:
The following road construction project is in progress: bridge repair with delays 5 minutes, lanes reduced to 1, no passing, speed limit 35 mph, traffic routed to opposing lanes, truck speed limit 35 mph, and width limit 12 ft daily between 6:00 AM and 7:00 AM until 5:00 PM CDT Friday, October 16, 2026. For information or questions about a construction project, please find contact information for our SDDOT Area Offices at:
The listed work zone runs from 9.50 miles south to 6 miles south of the US 12 junction at Aberdeen, near milepost 187. The work is listed from 12:47 p.m. MDT (1:47 p.m. CDT) Tuesday, April 21, 2026, until 4 p.m. MDT (5 p.m. CDT) Friday, Oct. 16. The listing does not say which time zone applies, so both are given.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.
Around this record
The records published so far include 1 road record from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. One of them states an end date on or after it. SD511 is the department's own live conditions service.
This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.
Email me when this record changes
These records are re-read on a schedule. Pick something this record
states, and you'll hear when it is corrected or the filing behind it
is amended — and when any other published record states that same
value under that same field, whichever body published it.
Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number
or an employer — never a person's name or a street address.
What following means
·
Privacy notice