Road work: bridge repair listed on I-29 from June 22, 2026
The South Dakota Department of Transportation lists Road work: bridge repair at I-29 from 1 mile south to 0.75 mile south of 41st Street-Sioux Falls Exit 77, with a listed start of June 22, 2026.
605Buzz Added Record date Last ledger entry
Published automatically from public-record data — not yet reviewed by an editor.
I-29 near Sioux Falls Exit is scheduled for bridge repair in both directions.
Work includes bridge repair on bridges daily between 7 a.m. and 6 a.m. until further notice. 49th St I29 overpass closed for bridge repairs. Work will include periodic lane closures on I29.
The listed work zone runs from 1 mile south to three-quarters of a mile south of 41st Street-Sioux Falls Exit 77, near milepost 77. The work is listed from 5 a.m. MDT (6 a.m. CDT) Monday, June 22, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.
Around this record
The records published so far include 5 road records from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. SDDOT published no end date for all of them, which is how the department represents work scheduled until further notice — whether those are current cannot be worked out from the records, and no guess is made. SD511 is the department's own live conditions service.
Restrictions: paving listed on SD-44 from June 22, 2026
— 12.9 miles from the
coordinate its source published, in a straight line
, SD-44 from 0.50 mile east of Junction South Dakota 17-Lennox to Junction Interstate 29 near Worthing
This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.
Email me when this record changes
These records are re-read on a schedule. Pick something this record
states, and you'll hear when it is corrected or the filing behind it
is amended — and when any other published record states that same
value under that same field, whichever body published it.
Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number
or an employer — never a person's name or a street address.
What following means
·
Privacy notice