Restrictions: bridge construction listed on US-385 from July 6, 2026
The South Dakota Department of Transportation lists Restrictions: bridge construction at US-385 from 1 mile north to 1.50 miles north of Junction US 18 West-Hot Springs, with a listed start of July 6, 2026.
605Buzz Added Record date Last ledger entry
Published automatically from public-record data — not yet reviewed by an editor.
US-385 near Hot Springs is scheduled for restrictions during bridge construction in both directions.
Restrictions include width limit 12 ft until further notice. A City Bridge Project Requires a temporary lane shift. No Vehicles over 12 feet wide.
The listed work zone runs from 1 mile north to a mile and a half north of the US 18 West junction at Hot Springs, near milepost 36. The work is listed from 7:09 a.m. MDT (8:09 a.m. CDT) Monday, July 6, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.
Around this record
The records published so far include 3 road records from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. SDDOT published no end date for all of them, which is how the department represents work scheduled until further notice — whether those are current cannot be worked out from the records, and no guess is made. SD511 is the department's own live conditions service.
This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.
Email me when this record changes
These records are re-read on a schedule. Pick something this record
states, and you'll hear when it is corrected or the filing behind it
is amended — and when any other published record states that same
value under that same field, whichever body published it.
Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number
or an employer — never a person's name or a street address.
What following means
·
Privacy notice